Skip to content
A construction site seen from above with cranes and excavations, where a builder starts a new project

Homeowners · Builders

Builders on the Costa del Sol for new builds and extensions

Quick answer

Builders on the Costa del Sol work alongside an architect and a technical architect on any new build or extension: the project, the building licence and site supervision are legal requirements, and new homes must carry ten-year structural insurance. Choose a builder with recent local projects you can visit.

What's included

What builders on the Costa del Sol handle

  • New villas on your plot

  • Extensions, new floors and garages

  • Pools and outdoor structures

  • Structural repairs and retaining walls

  • Coordination with architect and technical architect

Who does the work

Who is on a building project in Spain

Who is on a building project in Spain
RoleWhat they do
ArchitectDesigns the project and applies for the licence
Technical architect (aparejador)Supervises execution and safety on site
BuilderBuilds to the project and contract
Developer (often you)Commissions the work; for new homes, arranges ten-year insurance1

Indicative prices

What decides the cost

Plot conditions, slope and access, the quality of finishes, the structure and the size. Building on a hillside plot in Benahavís is a different job from an extension in town. Compare quotes against the same project and the same specification document.

Frequently asked questions

Can I build a villa on a plot I've bought?

If the plot is classified as buildable and you obtain a licence for an architect's project, yes. Check the planning status before buying the plot.

What is ten-year structural insurance?

Insurance covering structural defects in new homes for ten years, required for new residential buildings under Spain's Building Act1.

Do I need both an architect and a builder?

Yes. The architect designs and signs the project; a technical architect supervises; the builder executes.

How long does it take to build a villa?

Usually well over a year from project to keys, including the licence, depending on size and the town hall.

How should payments to a builder be structured?

In stages tied to certified progress, with a retention at the end.

Can I build an extension on my existing villa?

Only within the buildable area and height allowed on your plot, and with a building licence.

What should I check before hiring a builder?

Recent finished projects, insurance, registration as a company and references from owners.

Who handles connections to water and electricity?

The builder coordinates them; the utilities require certificates from authorised installers.

Request a quote

Building or extending?

Tell us the plot or the home and what you plan.

Sources

  1. Law 38/1999 on Building Regulation (Ley de Ordenación de la Edificación), ten-year structural insurance for new homes.